Experienced engineering team of MEKA with excellent engineering background ensures that best solutions with maximum results.
Recently, a mobile hopper for coal unloding has been installed at Gdańsk port in Poland.
This terminal is designed to ensure high throughput capacity of dry bulk cargo, mainly coal and iron ore, and to utilize at the same time the best available technologies in environmental protection.
MEKA has installed 1 unit 400 ton/h Mechanical Stabilisation Plant and 1 unit MB-K140 Concrete Batching Plant for one of the biggest contractors of Iraq for the final section of Erbil’s 120 Meter Road.
MoreLeading precast manufacturer companies in Ankara preferred MEKA for its Akyurt-Ankara factory due to the high quality and advanced technology of MEKA.
MoreIlgaz Construction, which has a total of 5 MEKA Concrete Plants, has preferred again MEKA Concrete Plants for this large project in Romania.
MoreThe high-level of customer-experience of MEKA led to the 8th order from HeidelbergCement Georgia.
More