TWO MEKA MB-110K CONCRETE BATCH PLANTS IN HINKLEY POINT C

MEKA has recently installed two concrete plants for the Kier-Bam joint venture to important nuclear power plant project - Hinkley Point C, which is one of the most important ones in the UK. Quality of concrete to be used in nuclear industry is unquestionable and these two plants were designed specifically to meet the requirements of the site. Being able to produce concrete under cold weather conditions the plants are equipped with aggregate hot air heating system, unique radial feeding conveyors, mixer moisture probe for water/cement ratio correction and fiber dosing systems.

OTHER CONTENT

SIGN UP FOR OUR NEWSLETTER