Special 135, 180 and 250 m³/h capacity MEKA Concrete Plants are used for Istanbul 3rd Airport project which will have the greatest passenger capacity. Within the scope of supply of this concrete plant project aiming for speed, high capacity and simultaneously high accuracy and quality, a unique Aggregate Bin is used. These bins which are designed completely by MEKA have individual weighing systems. Under each section that has 75 m3 capacity, there is a weighing hopper only for that section. Total capacity of the bin with 5 sections is more than 375 m3. Optionally, it is also possible to produce a bin with 4 sections and 300 m³ capacity.
Individual weighing system can simultaneously weigh all types and sizes of aggregates in each section in the recipes and can reach a significant speed in cases where more than 2 types of aggregate is used. Apart from that, it has high accuracy up to 1/1000 since weighing card is added to PLC for weighing hopper under each section and weighing hopper is only for that type of aggregate.
MEKA has proven once more that it is the choice of Professional, and it continues to provide services for the industry with its strong engineering infrastructure and to be one of the best choices in important projects worldwide.
The high-level of customer-experience of MEKA led to the 8th order from HeidelbergCement Georgia.
MoreMEKA together with our local solution partner Berkshire Engineering Supplies (BES) is proud to be a part of one of the most important and prestigious infrastructure projects in the UK.
MorePrimary group MEKA feeder and MPI 1313 primary impact crusher have been preferred for the newly established plant in France
MoreMEKA will Meet the Concrete Demand of the First Renewable Energy Installation in The Republic of Djibouti
More