The
ASO 1st Organized Industrial Zone Expansion Project, one of Ankara’s most significant industrial investments, has chosen MEKA to meet its demand for high-capacity and uninterrupted concrete production.
The project is powered by the
MEKA K145 Stationary Concrete Batching Plant, equipped with a
3.33 m³ twin-shaft mixer and featuring a
fully hot-dip galvanized main unit for maximum durability and long service life.
With its
high production capacity and
robust design, the K145 has become an indispensable solution for large-scale and demanding projects. In this expansion, it ensures reliable and efficient concrete supply for uninterrupted operations.
Once again, MEKA proves to be the trusted choice for
reliability, durability, and
high performance in major projects worldwide.