EN

Has chosen MEKA for Egypt Al-Maza Airport Project.

Has chosen MEKA for Egypt Al-Maza Airport Project.

The world’s third greatest cement producer, CEMEX of Mexico origin speeded up its Egypt investments. The company which has a cement factory with 3 production lines in Egypt continues its growth in ndustry with its ready-mix nvestments. The leader company has chosen MEKA’s MB-100M mobile which provides flexible solutions for short terms projects for AL-MAZA AIRPORT project in Egypt.

MEKA  are commonly preferred by our clients in projects that require fast and low cost mobilization thanks to their qualities such as;

  • Easy and Quick Installation, Easy Transportation
  • Transportation with a Single Tow Truck
  • Use of High Quality Materials
  • Fast Service and Spare Parts
  • Resistant Abrasion-Proof Mixer Components
  • High Resistance in Challenging Conditions
  • Cost Effective Design That Decreases Operation Costs
Share this page

MEKA GLOBAL

CONTACT YOU