The Belarus Republic plans to build 4 hydro-electric power plants: Polotskaya, Vitebskaya, Beshenkovicheskaya and Verhnedvinskaya within the scope of the energy safety policy that it aims to achieve until 2020. Total electricity generated by the HPP’s that will be built is planned to be around 125-130 MW.
5 turbines will be installed at the Polotskaya HPP and the total power of the turbines is calculated as 21.75 MW. Meanwhile, 111.4 million kWh of electricity planned to be generated annually will meet the electricity requirement of Polotsky Rayon. The related project will also ensure fuel savings equivalent to 35,000 tons of oil in the region where it will be built. The project where construction has started in 2011 is planned to be completed by 2015.
The plant that will meet the requirement of the site bears the signature of MEKA. A MEKA with the winter option is capable of producing high-class and quality even under the most challenging climate conditions.
Our valuable customer is already operating five of our concrete plants and we take extreme pride in being chosen by them for the supply of aplant for their road construction project in Tarsus, Mersin.
More3 stage c plant is designed with the support of our valuable solution partner for Dolomitic Limestone and is intended for producing 3 sizes of Aggregates and sand.
MoreMEKA takes extreme pride in being selected by our customer for the complete supply of a new installation
MoreFind us at booth C32690 to see the latest innovations, discuss your challenges and gain a better understanding of equipment and services.