As MEKA Global, we have completed the sale and delivery of our
K145 compact concrete batching plant to be used in the works carried out by TRIO Çelik within the scope of the 3rd runway construction at Ankara Esenboğa Airport. Designed to ensure continuity and quality in high-standard projects such as airports, the K145 provides a capacity of 140 m³/h, a twin-shaft mixer producing 3.33 m³ per cycle, and a fully automated control infrastructure. In addition, its hot-dip galvanized structure and compact design suitable for container transport enable fast on-site installation and long service life.
The project’s most visible milestone took place recently. Esenboğa Airport’s 3rd runway (3,750 m long and 75 m wide) and the new 77 m air traffic control tower were officially commissioned on 19 January 2026 at a ceremony attended by President Recep Tayyip Erdoğan. According to information shared by the Ministry of Transport and Infrastructure, with the capacity increase, the airport’s annual passenger capacity is targeted to rise from 20 million to 30 million, and the total investment value was announced as EUR 298 million. At the opening ceremony, President Erdoğan emphasized that, in line with growing demand, Esenboğa requires greater capacity and higher standards, and stated that the project was realized without “a single penny” coming out of the public treasury. He also underlined Türkiye’s aviation growth vision, noting that the country is moving “towards the future with new hopes and bigger goals.”
As MEKA Global, we will continue to develop solutions that deliver the right production capacity, sustainable quality, and uninterrupted on-site performance through our mobile, compact and stationary concrete batching plants deployed across Türkiye and around the world for high-standard infrastructure projects. We are proud to be part of strategic investments such as the Esenboğa 3rd runway, and we thank TRIO Çelik for their trust and collaboration.