The governments of Japan and Sudan signed an agreement for a water treatment plant in Kosti City
The objective of the Project is to upgrade the capacity of water supply in Kosti city through construction of water treatment facility
Although Sudan is one of the richest countries in water resources, it faces a variety of challenges in the water sector such as the outdated water networks and the poor access to water.
The project will raise the capacity of the existing plant. The new treatment plant will provide approximately 23,700m3 of water per day.
Big Japanese company has chosen MEKA and a MB-K30 Compact Concrete Batching Plant has been installed to meet the requirement of 12.000 m3 of concrete in 12 months. MB-K30 is a very compact, easy to transport and to install batching plant.
The project will be completed in 2021 and is expected to provide clean water to around 380,000 people by 2024.
The high-level of customer-experience of MEKA led to the 8th order from HeidelbergCement Georgia.
MoreMEKA together with our local solution partner Berkshire Engineering Supplies (BES) is proud to be a part of one of the most important and prestigious infrastructure projects in the UK.
MorePrimary group MEKA feeder and MPI 1313 primary impact crusher have been preferred for the newly established plant in France
MoreMEKA will Meet the Concrete Demand of the First Renewable Energy Installation in The Republic of Djibouti
More