The last days of 2022 have witnessed the delivery of a MEKA crushing and screening plant in CHELYABINSKAYA District, Russia.
Under harsh winter conditions, plant is erected and brought into operation with the support of our valued solution partner MEKA RUSSIA.
Plant capacity is already exceeding customer’s requirements and MEKA has proven once more that it is the choice of professionals, and it continues to provide services for the industry with its strong engineering infrastructure and be the primary choice of aggregate producers’ in the world with its high quality, reliable crushing and screening equipment.
A Custom Solution Tailored to Project
We have an extensive knowledge base and adaptability when it comes to speciality.
During the design process and the selection of equipment, we worked hand in hand with our customer’s technical staff to comply with a long list of pre-requisites.
These pre-requisites stemmed from a long list of conditions, which included particularly the following domains;
• Granite with a complex physical and mechanical structure,
• Extremely difficult climatic conditions,
• Inaccessible area,
• Plant layout suitable for future expansion.
Plant Design Criteria
The solution for this plant included engineering, supply of all required equipment and steel structures, installation supervision, commissioning by our service engineers, and timely supply of spare and wear parts.
• Material to be processed is Granite with a solid density of 2.7 tons/m³, Abrasion index (A¡) 0,55 ± 0,1
• Feed material size : 0-800 mm
• 7 grades of products are produced
• The hourly production of required products is 200 metric tons/hour.
Equipment Selection
Feed Hopper with 30 m³ volume,
Apron Feeder
MJ 110 Jaw Crusher
Hydraulic Rock Breaker
Grizzly Screen MGS 1640/2
Secondary Cone Crusher
Tertiary Cone Crusher
MSH 2060/4 Inclined Heavy-duty Screen
MS 2060/4 Inclined Screen
Belt Conveyors
Dust Suppression System
Belt Scales
Electrical Control System with Supervisory Control and Data Acquisition
The Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
MoreM100 and M120 mobile concrete batching plants were the cornerstones of a new residential complex in Al-Mansour, Baghdad. In this comprehensive project, our customer, who had previously completed successful projects with our K145 model, preferred MEKA's mobile solutions this time as well. This complex, consisting of 30 units 12-storey buildings in total, was designed to meet all the needs of modern life.
MoreThe construction of the one of the most prestigious marina projects in Les Almadies, Dakar, has started with MEKA concrete batching plant. The Spanish company chose MEKA for this major project, which involves the construction of a marina and a luxury hotel by the sea in Almadies.
More